
Installation & Service
Metan KZ specialists perform installation, commissioning, and maintenance of gas equipment, ensuring reliable and safe operation.

We offer
We professionally install equipment following all engineering and safety requirements.
We install high-pressure pipelines and storage modules with reliability and durability.
We test equipment, adjust parameters, and verify stable system performance.
That's how we do it
01
Project analysis and calculation
We inspect the site and determine the optimal technical solution.
02
Contract and documentation
We prepare the estimate, agree on conditions, and sign the contract.
03
Equipment delivery and preparation
We deliver the equipment and prepare the site for installation.
04
Installation and commissioning
We install the system and put the facility into operation.
Our benefits
Stable methane supply with fair pricing, modern infrastructure, and 24/7 support.
Stable Supply
We provide a stable supply of certified methane according to KZ and UZ standards, ensuring quality and transparency at every stage.
Cost Efficiency
The optimal methane price is ensured through our own infrastructure and well-organized, expanded regional logistics between Kazakhstan and Uzbekistan.
24/7 Assistance
Our office in Samarkand operates without days off. We offer support, consultations, and prompt solutions to any issues at any time.
Related projects
Explore all our projects
Pricing
We offer three levels of CNG station configuration.
| Items | Basicfrom $20,000 | Standardfrom $35,000 | Businessfrom $50,000 |
|---|---|---|---|
| Station engineering and design | |||
| Supply of essential equipment | |||
| Gas storage modules | |||
| High-pressure pipeline installation | |||
| Compressor system installation | |||
| Safety and automation system | |||
| Station configuration (visual layout) | limited | ||
| Remote monitoring system | |||
| Completion time | 15 days | 25 days | 35 days |








